.jpg)
Partenering with Voorbij Funderingstechniek, we realized as much as 20 temporary and 25 permanent works along the 11 km extension of A16.
Project name
Groene Boog - foundations
Category
Road works, Tunnels, Bridges
Techniques
Soil displacement screw pile with lost tip, Micropile
Contract type
Build
Location
Rotterdam, The Netherlands
Client
Groene Boog (BESIX, Dura Vermeer, Van Oord, John Laing, Rebel, TBI)
Building Period
2020 - 2022