Our team is currently installing 7 to 8 piles per day, for a total of 183 micropiles, at depths ranging from 15.5 to 17.5 meters. These works ensure the stability and durability of the structure, essential for the building’s rehabilitation and modernization.
Matisse 16 combines:
Modern offices – Matisse 16 Working
Quality residences – Matisse 16 Living
Commercial spaces
This redevelopment transforms an obsolete office building into a mixed-use project offering a new urban living experience in Brussels.
We are proud to contribute to this project alongside Vanhout, for BESIX RED. The project perfectly illustrates the synergy within the BESIX Group, with three of its subsidiaries active on site: BESIX RED, Vanhout, and Franki Foundations.